<address id="pfvnx"><video id="pfvnx"></video></address>
<dl id="pfvnx"></dl>
<video id="pfvnx"><dl id="pfvnx"><delect id="pfvnx"></delect></dl></video>
<video id="pfvnx"></video>
<dl id="pfvnx"></dl>
<dl id="pfvnx"><output id="pfvnx"></output></dl>
<dl id="pfvnx"></dl>
<video id="pfvnx"><output id="pfvnx"></output></video>
<dl id="pfvnx"><delect id="pfvnx"></delect></dl>
<output id="pfvnx"><font id="pfvnx"><meter id="pfvnx"></meter></font></output>
<dl id="pfvnx"><output id="pfvnx"><meter id="pfvnx"></meter></output></dl><dl id="pfvnx"></dl><video id="pfvnx"><output id="pfvnx"></output></video><video id="pfvnx"><output id="pfvnx"><delect id="pfvnx"></delect></output></video><video id="pfvnx"></video>
<dl id="pfvnx"></dl><dl id="pfvnx"><delect id="pfvnx"><meter id="pfvnx"></meter></delect></dl>
<video id="pfvnx"><output id="pfvnx"></output></video>
<video id="pfvnx"><output id="pfvnx"></output></video>
<video id="pfvnx"></video>

隧道瓷化涂料施工工藝

第一步準備工作 施工機具:砂漿攪拌機、專用噴涂設備(擠壓式灰漿泵、空壓機)、無氣噴涂機、抹灰漿專用鐵板、清洗用具、運輸工具等。

第二步 清理、修補 將隧道砼表面的浮塵、油污等清洗干凈。 修補凹凸不平的地方,確保隧道砼表面的平整。同時對砼表面特別光滑的地方,要求用砂漿抹面。漏水的地方一定要補漏止水。 采用機械徹底、完整打磨混凝土基層表面,除去原表面的反堿、塵土、薄膜、油漆、表面涂層及其它外來物,并鏟除疏松、空鼓和蜂窩結構,使表面徹底浸透,除去積水和明水。

第三步噴涂納米滲透封閉底漆 檢查基層處理是否達到要求,在涂施前清理干凈墻面粉塵;照材料要求,采用攪拌機在配料桶中攪拌均勻;在基層面上噴涂均勻,形成良好的界面。如涂料稠漿濃可以加水,水和涂料以10:1的比例混合,用攪拌機攪拌20min(一定要確保攪拌時間,涂料要隨拌隨用), 成稠漿狀。

第四步批刮反光耐水專用膩子 采用專用刮板刮涂耐水膩子,對于較差部位應加刮耐水膩子。后道膩子層施工應在前道膩子層表干后進行。施工時隨時甄別墻面平整狀況,并通過手法控制找平墻面。 耐水膩子層干燥后,采用打磨機打磨膩子層,先粗后細,然后清潔打磨殘留物,為后道工序提供合格作業面。含水率低于10%以下,再 進行下一項施工。

第五步噴涂瓷化反光面涂(B組份) 施工前應檢查環境是否符合面涂施工要求,采取措施防止面涂施工時粉塵(包括夏季蚊、蠅)等污染物對面涂的污染。采取遮擋、粘貼等方法防止面涂施工對現場其他成品及設備的影響。

施工完畢后應進行養護,養護時間不應少于7天。